top of page
MSTI 30th Anniversary Logo (7).png

Project Scheduling & Estimating

Project estimation helps project managers and stakeholders obtain a sense of how long a project will take, what kind of resources are needed, and what deliverables will be required for project completion.

As a design project progresses, it is common for project management teams to produce multiple estimates during the preliminary design, detailed engineering, and tendering phases. The completed project estimates become more accurate as the project’s level of definition increases. MS Technology follows the DOE 413.3 guide for cost estimating, utilizing a five-level system of cost estimate classifications.

 

A well-structured and managed schedule is an impressive controlling tool that in combination with sophisticated software packages, allows project controllers and project managers to integrate multiple sources of information, to produce vital status updates and forecasts during the project lifecycle.

  • Class 1 to Class 5 estimate generation

  • Execution schedule development with full resource loading

  • Small to large (>$25M) planning projects

  • Build project baselines

  • Obtain and track critical paths and dependencies

  • Manage resources and supplies

  • Level resources and supplies

  • Spend planning

  • Resource burn curves

bottom of page